How Long Does a Professional Power Washing Job Really Take?

How Long Does a Professional Power Washing Job Really Take?

You booked a power washing appointment and cleared your schedule — but now you’re wondering: how long is this going to take? Will it be done before lunch? Or will the crew still be there by dinner?

The answer depends on several key factors — including the size of the area, the type of washing, the equipment used, and even the weather. 🌤️

Here’s a breakdown of what to expect when hiring a professional power washing company, and how long typical jobs take.


🏠 1. Surface Area is the #1 Factor

The more square footage, the more time it’ll take — no surprise there. But here are some rough estimates:

  • Driveway (2-car width): 30–60 minutes
  • Sidewalks + Walkways: 20–45 minutes
  • House Siding (1,500–2,000 sq ft): 1.5–3 hours
  • Deck or Patio (300–500 sq ft): 1–2 hours
  • Roof Soft Washing: 2–4 hours (depending on height and pitch)
  • Fence (100–200 linear feet): 1–2 hours

These are just averages. A good company will assess your surfaces and give you a more accurate time estimate in your quote.


🧼 2. Power Washing vs. Soft Washing

Not all power washing is high-pressure blasting. Some surfaces — like vinyl siding, roofs, or painted wood — require soft washing, which takes a bit longer due to:

  • Pre-soaking the surface with detergent
  • Letting it dwell for 10–15 minutes
  • Rinsing with low-pressure water

Soft washing adds time but protects delicate surfaces — and still gets incredible results. 🌿


🧴 3. Cleaning Agents and Prep Work

Many pros use biodegradable cleaning solutions to loosen grime before rinsing. That adds time, too:

  • Application: 10–20 minutes
  • Dwell time: 15–30 minutes
  • Rinse: 10–30 minutes

If you’re getting mold, algae, or rust stains treated, expect the technician to spend extra time scrubbing or repeating certain areas.


🧹 4. Prep and Cleanup Time

A professional crew doesn’t just roll up, spray, and leave. Time is spent:

  • Moving furniture or covering outlets
  • Protecting plants and landscaping 🌺
  • Taping windows or sealing vents
  • Final cleanup, rinsing residue, and tidying up equipment

Even on smaller jobs, 30–45 minutes of prep and breakdown is common.


☁️ 5. Weather Conditions Matter

Rain, wind, or extreme heat can slow things down:

  • Wet surfaces may require drying
  • High winds make spraying less accurate
  • Hot weather causes soaps to dry too fast, requiring reapplication

If bad weather is expected, some companies may reschedule to avoid a rushed or subpar job.


🚧 6. Accessibility and Complexity

A flat driveway? Easy. A 3-story home on a hill with a steep roof? Not so much. 🧗

Factors that add time:

  • Multiple stories or hard-to-reach areas
  • Obstructions (shrubs, fences, furniture)
  • Surfaces in poor condition (heavily stained, mildewed, or neglected)

The more challenging the access, the longer it takes.


🧑‍🔧 7. Solo Tech vs. Crew

A single technician with professional equipment can clean a driveway quickly — but bigger homes often require teams of 2–3 people to speed things up.

Ask how many people will be on the job — it can drastically affect the timeline.


🕒 Typical Job Timeline Examples

Job TypeCrew SizeAverage Time
Small house (1,500 sq ft)12–3 hours
Medium house (2,500 sq ft)22–3 hours
Large house (3,500+ sq ft)33–5 hours
Driveway + sidewalks11–2 hours
Deck + fence combo1–22–4 hours

✅ Final Thoughts

So, how long does power washing take? Anywhere from 30 minutes to a full day, depending on the size, surface, and complexity of the job.

To avoid surprises:

  • Ask for a time estimate in your quote
  • Clarify what prep and cleanup are included
  • Make sure you’re home (or available) if questions arise

Hiring a professional crew means faster results and no stress — your property will be spotless before you know it. 🧽🏠⏱️

Comments

No comments yet. Why don’t you start the discussion?

Leave a Reply

Your email address will not be published. Required fields are marked *